Golfer247 - The latest news and products from the world of golf
Main Menu | News By Date | News By Supplier | News By Category | About Us
 

SIDENOR COMMISSIONS WATER COOLING SYSTEM
20 February 2001 - Morgan Construction Company

The in-line, high-pressure water-cooling boxes incorporating Morgan Construction Company's Enhanced Temperature Control System (METCS) have been commissioned at SIDENOR's Vitoria (Spain) Rod Mill.

Ron Varo, Chief Metallurgist, who said that this was SIDENOR's first order with Morgan, noted that system was engineered and installed by Morgan-Europe, a subsidiary based in Sheffield, United Kingdom.

'The cooling boxes,' he continued, 'were installed and commissioned during the company's annual shutdown period. The Final Acceptance Tests (FATs) were completed soon afterward,' he added. The installation of the cooling boxes at the Vitoria plant, a single-strand combination rod and bar mill, was part of a phased modernization program of the SIDENOR mills.

The Vitoria mill produces a wide variety of plain-carbon, low-alloy and stainless steel rods for the automotive and general engineering industries.

http://www.morganco.com

About: Morgan Construction Company
Morgan Construction Company specialises in rolling mill technology. Founded in 1888, by Charles Hill Morgan in Worcester, Massachusetts, Morgan continues to grow and expand with new steel technologies. Morgan has designed and installed more than 450 rod, bar, and billet mills in more than 40 countries around the world.


More News:
  • For February 2001
  • From Morgan Construction Company
  • For General

 

©2008 New Materials International